|
|
|
|
|
|
|
Infrastructure
|
|
|
Ennore Port Limited has been endowed with large chunks of land. The Port would have
about 2000 acres of land.
EPL would provide all the infrastructure facilities required viz., water supply,
electricity, transmission corridor, fire fighting services, environmental protection
measures etc.
The facilities available at Ennore Port are
 | |  | |
| Berths |
Capacity |
Length (in meters) |
Max Permissible Draught (in
meters) |
Date of Survey |
Type of Cargo |
Size/Type of Vessels |
|
CB-1
|
8 MTPA |
280 |
13.5 |
Feb 09 |
Thermal Coal |
65,000-77,000 DWT |
|
CB-2 |
4 MTPA |
280 |
13.5 |
Feb 09 |
Thermal Coal/POL |
65,000-77,000 DWT |
|
MLT-1 |
3 MTPA |
360 |
13.5 |
July 09 |
POL / Chemicals |
upto 1,50,000 DWT |
| |  | |  |
 | |  | |
|
Breakwaters
|
|
South
|
1070 mtrs
|
|
North
|
3080 mtrs
|
|
Type
|
Rubble-mound with accropode armour protection
|
| |  | |  |
 | |  | |
|
Approach Channel
|
|
Length
|
3775 mtrs
|
|
Width
|
250 mtrs
|
|
Depth
|
16 mtrs BCD
|
|
|
Turning Basin
|
|
Diameter
|
600 mtrs
|
|
Depth
|
15.5 mtrs BCD
|
|
-
|
-
|
|
| |  | |  |
 | |  | |
|
Port Crafts
|
|
Tugs
|
3 nos.(40 tone Bollard Pull)
|
|
Pilot Launches
|
2 nos
|
|
Mooring Launches
|
3 nos
|
|
|
Navigational aids
|
|
Fairway Buoy
|
1 no
|
|
Channel Marking Buoys
|
6 nos
|
|
Transit light towers
|
2 nos
|
|
| |  | |  |
|





|
Equipment Profile (Installed by TNEB over Coal Wharf)
 | |  | |
|
Conveyors
|
Two streams with the rated capacity
|
4000 TPH each
|
|
Unloading Equipments
|
Shore-based Gantry Type Grab
|
Rated capacity
|
|
2 Nos
|
2000 TPH each
|
|
Mobile hopper
|
Mobile Hopper (to receive coal from Crane hopper self-unloading ship at the rate
of 4000 TPH)
|
1 No
|
|
Temporary hoppers
|
(To Receive coal from Handymax Geared Vessels)
|
6 Nos
|
|
|  | |  |
|
Connectivity
- Excellent road connectivity to NH4, NH5 & NH45
- Linked to Chennai - Kolkata, BG Main Line
- Connectivity to Chennai Airport
|
|