  Second Phase Development

 

Terminal

:Marine Liquid Terminal
 (POL/LPG/Chemical/Liquids)

Capacity

:3.0 MMTPA

Cost Estimate

:Rs. 196.25 Crores

Alongside Depth

:15m BCD

Jetty Length

: 210m

BOT Operator

: M/s Ennore Tank Terminal Pvt Ltd

(Consortium of IMC Ltd and L&T Ltd)

 

Terminal
:Iron ore Terminal
Capacity
:12.0 MMTPA
Cost Estimate
:Rs. 480 Crores
Alongside Depth :15m BCD (Phase-I) 18m (Phase-II)
Quay Length :525m

Development & Operation

:M/s SICAL Iron ore Terminals Ltd

(Consortium of SICAL Logistics Ltd and

L&T IDP Ltd)

 

 Terminal
:Coal Terminal
 Capacity
:8.0 MMTPA
 Cost Estimate
:Rs. 399.13 Crores
 Alongside Depth :15m BCD
 Quay Length :325m
 Development &
 Operation

:M/s Chettinad International Coal Terminal (P) Ltd

(Consortium of SICL, Portia Management Services Ltd and Navayuga Engineering Ltd)

 

Terminal
:Container Terminal (Phase –I)
 
Capacity
:18.0 MMTPA (1.5 million TEUs)
Cost Estimate
:Rs. 1300 Crores (Approx.)
Alongside Depth :15m BCD
Quay Length :1000m
Development & Operation :Private Sector Participation on BOT basis.
 Selection process to be initiated

 

Terminal
:LNG Terminal
Capacity
:5 MMTPA
Cost Estimate
:Rs. 2700 Crores (Approx.)
 (including regassification plant)
Alongside Depth :15m BCD
Jetty Length :300m
Development & Operation :M/s Indian Oil Corporation Ltd on BOT basis.