Second Phase
Development
|
 |
|
:Marine
Liquid Terminal
(POL/LPG/Chemical/Liquids)
|
|
|
:3.0 MMTPA |
|
Cost Estimate |
:Rs. 196.25 Crores |
|
Alongside Depth |
:15m BCD |
|
Jetty Length |
: 210m |
|
BOT Operator |
: M/s Ennore Tank
Terminal Pvt Ltd
(Consortium of IMC Ltd and L&T Ltd) |
|
Terminal
|
:Iron
ore Terminal
|
 |
|
Capacity
|
:12.0 MMTPA
|
|
Cost Estimate
|
:Rs. 480 Crores
|
|
Alongside Depth |
:15m BCD
(Phase-I) 18m (Phase-II) |
|
Quay Length |
:525m |
|
Development &
Operation |
:M/s SICAL Iron
ore Terminals Ltd
(Consortium of
SICAL Logistics Ltd and
L&T IDP Ltd) |
 |
Terminal
|
:Coal
Terminal
|
|
Capacity
|
:8.0 MMTPA
|
|
Cost
Estimate
|
:Rs. 399.13 Crores
|
|
Alongside
Depth |
:15m BCD |
|
Quay
Length |
:325m |
Development
&
Operation |
:M/s Chettinad
International Coal Terminal (P) Ltd
(Consortium of
SICL, Portia Management Services Ltd and Navayuga Engineering
Ltd) |
|
Terminal
|
:Container
Terminal (Phase –I)
|
|
|
Capacity
|
:18.0
MMTPA (1.5 million TEUs)
|
|
Cost Estimate
|
:Rs.
1300 Crores (Approx.)
|
|
Alongside Depth |
:15m BCD |
|
Quay Length |
:1000m |
|
Development &
Operation |
:Private Sector
Participation on BOT basis.
Selection process to be initiated |
 |
Terminal
|
:LNG
Terminal
|
|
Capacity
|
:5
MMTPA
|
|
Cost
Estimate
|
:Rs. 2700 Crores (Approx.)
(including regassification plant)
|
|
Alongside Depth |
:15m BCD |
|
Jetty Length |
:300m |
|
Development &
Operation |
:M/s Indian Oil
Corporation Ltd on BOT basis. |
|